電氣成套設(shè)備,,它是電氣設(shè)備。和開關(guān)和接觸器斷路器變壓器是一類的。但是它有它的獨特性。因為它是成套的。也就是說是把一系列的設(shè)備通過一定的規(guī)范(圖紙、技術(shù)要求、工藝要求)組合在一起,形成一個有機(jī)的整體。這樣的設(shè)備叫成套設(shè)備。通常咱們做的開關(guān)柜、箱式變電站等等都算作成套電氣設(shè)備。這是電氣成套設(shè)備公司內(nèi)的一個叫法。
Electrical equipment, first of all, it is electrical equipment. And switch and contactor circuit breaker transformer is a class. But it has its uniqueness. Because it's a complete set. That is to say, a series of equipment are combined together through certain specifications (drawings, technical requirements, process requirements) to form an organic whole. Such equipment is called complete equipment. Usually we do switch cabinet, box type substation and so on are counted as complete sets of electrical equipment. This is a name in the electric complete equipment company.
參與工程的初步設(shè)計的審定及施工圖紙的會審,主要審查電氣設(shè)計是否符合該項工程的要求及電氣設(shè)計是否合理。
Participate in the examination and approval of the preliminary design of the project and the joint examination of the construction drawings, mainly review whether the electrical design meets the requirements of the project and whether the electrical design is reasonable.
參與審查施工單位的施工組織設(shè)計及施工方案,主要審查施工單位施工人員的技術(shù)素質(zhì)及施工力量,能否滿足該項工程的技術(shù)及進(jìn)度要求。
Participate in the review of the construction organization design and construction scheme of the construction unit, Harbin mainly reviews the technical quality and construction strength of the construction personnel of the construction unit, and whether they can meet the technical and schedule requirements of the project.
施工過程中抓好質(zhì)量及工程進(jìn)度。A、管理好施工用料的質(zhì)量,不符合設(shè)計及劣質(zhì)產(chǎn)品,要堅決杜絕。B、電氣敷管要著重檢查管子的彎曲半徑及管口是否進(jìn)盒,保證穿線、換線通暢。C、線絡(luò)絕緣一定要滿足規(guī)范要求。D、接地防雷裝置安裝時,引下線及接地線的搭接一定要滿足規(guī)范規(guī)定,接地電阻一定要滿足設(shè)計要求。E、做好隱蔽工程的檢查及認(rèn)證。F、與有關(guān)工程師做好配合。G、認(rèn)真做好現(xiàn)場簽證工作。H、抓好電氣施工的進(jìn)度。
Pay attention to the quality and project progress in the construction process. A. Manage the quality of construction materials, and resolutely eliminate the non-conforming design and inferior products. B. Electrical pipe laying should focus on checking the bending radius of the pipe and whether the pipe orifice is in the box to ensure that the threading and line changing are unobstructed. C. The wire insulation must meet the specification requirements. D. When the grounding lightning protection device is installed, the splicing of down lead and grounding wire must meet the specification, and the grounding resistance must meet the design requirements. E. Do a good job in the inspection and certification of concealed works. F. Cooperate with relevant professional engineers. G. Do a good job in site visa work. H. Grasp the progress of electrical construction.
做好交工驗收工作A、一定要按圖紙及規(guī)范驗收,保證工程質(zhì)量。B、電氣裝置一定要符合設(shè)計要求。C、做好售后服務(wù),認(rèn)真及時解決客戶提出的問題。參照第3條DEFGH執(zhí)行。
Do a good job of acceptance work a, must be in accordance with the drawings and specifications acceptance, to ensure the quality of the project. B. Electrical devices must meet the design requirements. C. Do a good job in after-sales service, seriously and timely solve the problems raised by customers. Refer to Article 3 defgh.
做好售后服務(wù),認(rèn)真及時解決客戶提出的問題。
Do a good job in after-sales service, seriously and timely solve the problems raised by customers.